Dripping Springs SouthWest Connection (Pct. 3)
-
This project will design a new four-lane divided roadway to allow easier access to RM 12 and provide alternatives to US 290.
This project will connect with the Precinct 4 portion.
-
US 290 to Precinct 3 Boundary
-
$10,429,000 for design