Dripping Springs SouthWest Connection (Pct. 3)

  • This project will design a new four-lane divided roadway to allow easier access to RM 12 and provide alternatives to US 290.

    This project will connect with the Precinct 4 portion.

  • US 290 to Precinct 3 Boundary

  • $10,429,000 for design