Dripping Springs Southwest Connection (Pct. 4)
-
This project will design a new four-lane divided roadway to allow easier access to RM 12 and provide alternatives to US 290.
This project will connect with the Precinct 3 portion.
-
Precinct 4 Boundary to RM 12
-
$5,742,000 for design