hillside terrace

  • This project involves the construction of a two-lane roadway divided with center turn lane from I-35 to Old Goforth Road, a four-lane roadway divided with center turn lane from Old Goforth Road to FM 2001, and two-lane divided roadway with center turn lane along Old Goforth Road.

    Preliminary engineering report and part of ROW was funded by the 2016 Road Bonds. The county’s transportation department funded detailed design and part of the ROW process.

  • I-35 to FM 2001

  • $35,325,000 for construction, utilities, and CEI