FM 2001 East interim
-
This project will design a new alignment of the roadway with two lanes undivided, shoulders, and turn lanes.
The project schematic and environmental study was previously funded through the 2016 Road Bonds. In addition, the project has seven million in funding from CAMPO.
-
Graef Rd. to Southeast of SH 21.
-
$1,764,000 for design and utilities