Fm 150 east (PCT. 2)

  • This project involves a study to determine whether widening of the roadway from two lanes to four lanes divided is needed. Project will connect with a Precinct 1 Segment.

  • Lehman Road to Precinct 2 Boundary

  • $788,000 for feasibility study