Fm 150 east (PCT. 2)
-
This project involves a study to determine whether widening of the roadway from two lanes to four lanes divided is needed. Project will connect with a Precinct 1 Segment.
-
Lehman Road to Precinct 2 Boundary
-
$788,000 for feasibility study