FM 150 East (PCT. 1)
-
This project involves a study to determine whether widening of the roadway from two lanes to four lanes divided is needed. Project will connect with a Precinct 2 segment.
-
Precinct 1 Boundary to SH 21
-
$788,000 for feasibility study