FM 150 East (PCT. 1)

  • This project involves a study to determine whether widening of the roadway from two lanes to four lanes divided is needed. Project will connect with a Precinct 2 segment.

  • Precinct 1 Boundary to SH 21

  • $788,000 for feasibility study